Aviva Stadium, Dublin

The Aviva Stadium build began in May 2007 and was completed in May 2010 costing a total of €410 million. The new Stadium has a seated capacity of 50,000 and provides superb facilities for spectators, players, media and staff. Aviva Stadium’s integrated security solution includes; fire detection, CCTV (190+ cameras), access control (CEM AC2000 SE), intruder alarms, fire suppression and disabled toilet alarms. CEM Approved Resellers, ADT Dublin selected CEM AC2000 SE (Standard Edition) system to secure the Aviva Stadium.
“AC2000 VIPPS provides Aviva Stadium with a cost effective method of producing both permanent and reusable temporary passes” said Donal Colfer, Commercial Manager, ADT Dublin.